E15 × BUILT × OPERATIONS

Insight shapes it.
Design makes it possible.
Operations brings it to life.

Great venue experiences begin long before the first guest arrives. They begin with understanding the audience, asking more of the space and designing every detail around the people who will use it.

E15, BUILT and Operations connect that thinking. Together, they bring evidence, creativity and practical delivery into one conversation — from the first brief to a working venue.

Internal capability draft · project claims require owner validation before external submission
ONE CONNECTED APPROACH

Every idea has a path to delivery.

01 / E15

Understand what matters.

Read the audience, demand and trading patterns. Establish the evidence, test the assumptions and identify where an intervention can make a meaningful difference.

Insight → a clear brief
02 / BUILT

Give the opportunity form.

Translate that brief into masterplans, guest experiences, service formats and coordinated design. Connect the front-of-house ambition with the space, systems and infrastructure behind it.

Brief → a workable solution
03 / OPERATIONS

Make it work in the venue.

Bring the reality of people, menus, stock, service and event-day pressure into the design. Prepare implementation, transition and delivery around an agreed scope.

Solution → operational readiness
Operational learning informs the next decision. E15, BUILT and Operations stay connected throughout.
Understand→Define→Design→Validate→Deliver→Learn

The discipline is simple: understand the need, develop the response and test it against real operating conditions. Technology, design and investment earn their place by the job they do for the guest and the venue.

SIX CONNECTED CAPABILITIES

From the whole venue
to the moment of service.

01

Masterplanning

Set the direction for the venue: where the offer belongs, how spaces connect and how development can be phased.

02

Technology

Connect digital, POS, frictionless and AI-scanning options to service needs, integration requirements and delivery readiness.

03

Design + Build

Translate the concept into deliverable spaces, coordinating design intent, equipment, technical interfaces and the agreed build scope.

04

Marketing + digital activation

Give the offer a clear identity and a reason to visit. Connect launch, guest communication and activation to the venue experience.

05

Implementation + delivery

Bring workstreams, suppliers, systems and operating teams together around a practical plan, accountable owners and clear handovers.

06

Transition

Prepare people and processes for the change. Align training, systems, service routines and readiness checks before going live.

SPECIALISTS AROUND A SHARED BRIEF

The right expertise.
At the right point.

Marketing, strategy, design, innovation, systems and technology specialists contribute alongside the venue’s operating team. The purpose is a joined-up solution: a compelling guest proposition with the practical detail to deliver it.

MarketingStrategyDesignInnovationSystemsTechnology

Working team note: “+30, plus 20.20 & Benchmark”. Confirm the headcount basis, specialist availability and partner roles before using this as a formal resourcing claim. Capability does not establish named Milano appointments.

Different venues. The same delivery discipline.

StadiaArenasConference & exhibition venuesRacecoursesFestivalsCultural institutions
PROJECT PORTFOLIO / 2025–2026

Experience made tangible.

The portfolio brings the approach into focus: masterplanning and hospitality development alongside production infrastructure, retail formats, technology and digital activation.

Projects below are identified as delivered in the supplied 2025–2026 working list. Individual completion dates, delivered scope, team contribution and client permissions still require confirmation. This is a capability overview, not the completed RFP reference schedule. R&D, speculative concepts and unconfirmed future delivery are excluded from this completed-project group.

Project / venueScope recorded in the working list
YTLMasterplan, technology overlay and hospitality development.
The O2 ArenaThree frictionless formats; Level 3 masterplan, boxes and super suite.
NECIn-hall and arena projects; UAB and BP Pulse named in the working list.
ExCeLWaterfront restaurant, CPU and in-hall concepts.
Aston VillaNorth Stand and warehouse.
Birmingham CityInterface project; detailed scope to confirm.
CharltonTechnology.
EdgbastonBoxes.
CheltenhamBox Bars, general-admission areas and associated spaces.
HuddersfieldPOS, systems and hospitality development.
TigersHospitality suite; exact venue identity to confirm.
LEXPOS and technology; full project identity to confirm.
NTGrind and summer activations; full client identity to confirm.
WimbledonFrictionless, Beerjet, restaurant and digital.
SECCPU, Hydro retail, Sky Bar and hospitality upgrades.
JCARetail technology; full project identity to confirm.
FURTHER PROGRAMME / SEPARATE FROM DELIVERED WORK

Keep the next chapter clear.

The second list does not establish a common year or completion status. These projects remain separate until each owner confirms what is commissioned, in development, being delivered or complete. Quantities below are working-note figures, not a verified deployment total.

Project / venueScope recorded in the working listStatus
Manchester UnitedRetail and fan zone development; six frictionless formats and 32 Box Bars listed.In development
ConduitTwo restaurants.Status to confirm
NEC / in-hall and arenasUAB and BP Pulse: eight frictionless formats, six in-hall restaurants, two restaurants and QSR / Subway listed. Check scope boundaries and overlap with the delivered list.Status to confirm
SECRetail and masterplanning.Status to confirm
RDSRetail, hospitality and new stand.Status to confirm
SpursFan zone, premium and beer technology.Status to confirm
AvivaMasterplan.Status to confirm
SwanseaHospitality development.Status to confirm
EICCTasting kitchen / CPU project; exact scope wording to confirm.Status to confirm
JCARetail technology and frictionless.Status to confirm
FCURetail and digital; full project identity to confirm.Status to confirm
Uber EatsAI technology; deployment status and delivery scope to confirm.Status to confirm
AustraliaTwo frictionless formats noted, alongside frictionless, digital and POS activity. Venue names, dates and whether these items overlap remain open.Status to confirm
TECHNOLOGY EVIDENCE / INPUT NEEDED FROM LORRAINE

Show what is live.
Then show what it changes.

A strong technology story connects deployment to purpose: the service problem, the technology introduced, the operating change and the measured result. PULSE and the wider digital strategy need the same clear evidence.

Evidence to supplyWhat must be clear
Deployment recordVenue, technology, quantity, go-live date and live / pilot / planned status. Separate outlets, lanes, devices and transactions.
PULSEApproved description, actual functions, venue coverage, implementation status and its role in the wider digital strategy.
Digital strategyGuest and operator use cases, system integrations, rollout priorities and ownership of delivery and support.
Measured resultsWhere available: adoption, transactions, throughput, service time, availability, spend and labour effects — each with a baseline, measurement period and comparable scope.
Approved proofNamed owner, client-approved case study, imagery and permission to use figures externally. Do not combine the two project lists into a deployment total.
WHAT THIS MEANS FOR MILANO

Design with the guest in mind.
And delivery in view.

For Milano, this approach supports the required Design Consultation and Approvals proposal. E15 informs demand and decisions. BUILT connects the experience to spaces and systems. Operations tests how the proposed solution will perform in practice, working with Italy’s team and the appointed designers.

Our response must turn that approach into a defined consultancy scope, named team, phased deliverables, approval interfaces and fee. Any concessions, premium F&B or catering operation remains a separate award. The wider Design + Build capability does not imply that Levy is appointed to construct the stadium or assume the responsibilities of the Client’s designers.

Open the Milano team assignments →