04 / WHAT TO SUBMIT & HOW TO PRICE ITINTERNAL BID GUIDE / 05 OCT 2026
ONE BID. EVERY DOCUMENT. CLEAR PRICES.
Build the required consultancy proposal first. Add separately identified operating options and any beneficial alternates. Select a document in the tree for its exact contents, format and source.
Required / source requirementOnly if offered / applicableMissing input / confirm firstSelect any document ↗
OPEN ANY DOCUMENT ABOVE
What goes in. Which format. Where it comes from.
Each leaf opens the requirement and a suggested way to package it.
FORM / REQUIRED
Signed Proposal Form
PROPOSED LEAD Bid Leadership + authorised signatory + Legal
What must be included
Use the supplied Proposal Form, not a substitute cover letter. Enter incorporation / registered office / VAT details, every applicable blank, all Addendum numbers and dates, signature date, name, title, phone, mailing address and email. Complete alternate / unit-price blanks if applicable. The authorised signatory must review all declarations on laws, licences, ambiguities, estimating risk, ethics, confidentiality, accuracy and Agreement acceptance. Resolve the conflicting validity dates before signing.
Format & treatment
Client form; complete electronically and sign. A signed PDF is recommended.
Suggested file
01_Proposal_Form_signed.pdf
Source requirement
RFP pp. 12-14; Arts. 5-6
H / REQUIRED / CONDITIONAL
NDA & partner clearance
PROPOSED LEAD Legal + Bid Leadership
What must be included
Include the executed main-bid LOI / NDA record; the supplied main NDA is already executed. For prospective partners / JV members / subcontractors: notify procurement separately in writing no later than two weeks after RFP receipt. Fill all Exhibit H blanks, obtain partner signatures, send to procurement for countersignature and obtain the fully executed NDA before disclosing RFP information. This pre-sharing clearance is not replaced by attaching an unsigned NDA at bid deadline.
Format & treatment
Attach the executed main NDA. Use Exhibit H for prospective partners.
Suggested file
02_Exhibit_H_Executed_NDA.pdf
Source requirement
RFP Art. 5; Exhibit A §01(iii); Exhibit H
SA / REQUIRED
Service Agreement response
PROPOSED LEAD Legal + Commercial + Bid Leadership
What must be included
Attach the supplied Service Agreement and put every proposed change directly into that form using tracked changes. Address specific wording, not a blanket "subject to negotiation" statement. Reconcile scope / timeline / fee / rates / conflicts / key personnel annexes and template residues. The signed Proposal Form accepts terms except expressly identified changes. Signing the definitive Agreement is a post-award step: selected bidder returns executed documents within two calendar days of receipt, before work starts.
Format & treatment
Supplied Agreement attached; any edits in tracked changes, preferably DOCX.
Suggested file
03_Service_Agreement_tracked.docx
Source requirement
RFP Art. 3; Art. 5; supplied Addendum_D00
CHECK / APPLICABILITY TO CONFIRM
Eligibility declaration
PROPOSED LEAD Legal + Italy entity + authorised signatory
What must be included
The supplied declaration concerns D.Lgs. 36/2023 eligibility / exclusion grounds, company registration, relevant representatives and declarations, with signature / identification requirements. Its header addresses Municipality 6 sponsorship initiatives for 2026-2027. Confirm that this is the correct form for this procurement before using it. Do not silently present it as an unconditional tender requirement or sign inaccurate declarations.
Format & treatment
Only complete the applicable, client-confirmed declaration; supplied Italian form asks for letterhead.
Suggested file
04_Eligibility_declaration_if_required.pdf
Source requirement
Supplied All. B declaration; not listed as a separate RFP Art. 5 exhibit
A / REQUIRED
Eight-section proposal
PROPOSED LEAD Bid Leadership + all functional teams
What must be included
Respond to all eight sections in the source order. Integrate or clearly cross-reference the supporting insurance, corporate / project evidence, staffing, scope, schedule and financial files. Each section below lists the required content; conditional or invited elements remain labelled.
Format & treatment
Responsive narrative with Sections 01-08; a bookmarked PDF is recommended.
Suggested file
05_Exhibit_A_Proposal_Response.pdf
Source requirement
Exhibit A pp. 1-3; RFP Art. 5
The eight required sections
01
Business
Cover letter: interest, unique advantage, lead contact, lead firm, team companies and commitment to named key people. Company: legal form, register extracts, history, size, financial capacity, resources, organisation / group, headquarters and contracting office. Describe Italy presence or establishment strategy / timing. Identify partnerships and disclose five years of threatened, live and settled claims / disputes / litigation, delivery method and outcome. Financial supporting evidence is encouraged.
02
Pricing
Complete phase prices / financial terms. Identify and price each alternate separately. Cross-reference Exhibit F and keep the compliant consultancy baseline visible.
03
Insurance
Sample current COI or equivalent; existing and proposed relevant cover, maximum limits, General / Professional / Auto / Employer liability / Errors & Omissions as applicable and other required risk cover.
04
Experience & commitments
Comparable concession, premium and catering projects from the last ten years. For each: name / location, owner representative name / title / address / email, description, final cost and aggregate contract value, delivery methods with percentage mix, operations manager / team, scope and active-construction experience where applicable. Five comparable client references; local preferred, international accepted if suitable local references are unavailable. Explain application of Italian laws; complete Exhibit D for projects / backlog.
05
F&B approach & execution
Narrative: objectives, fan journey, outlet flows / access, venue / security / event coordination and peak resilience. Execution plan: schedule, work plan, preparation, material / equipment storage, maintenance, self-service / standard formats, local sub-licensing, resource / revenue approach and POS / mobile / cashless / inventory / CRM / stadium integrations, explaining efficiency and premium-guest benefits. Include player / staff and third-party catering; scope, schedule, client-direct consultants with cost estimates and a Candidate / Client / subcontractor responsibility matrix. Add full staffing, Exhibit E + CVs, organisation chart, phase effort / commitments and partner qualifications. Include five similar projects in ten years and key-person experience. For a management model: matchday / VIP / special-event promotions, venue / sponsor cross-promotions and seasonal / themed offers. Address menus / outlets / sightlines / mobile pickup / self-service, recycling / eco-packaging / responsible sourcing and venue brand. Premium extension beyond the stadium is invited, with concept, feasibility, logistics, safety and partners.
06
Workforce inclusion
Past good-faith diversity / inclusion efforts, Italian market practice and intended local workforce, suppliers and community contribution.
07
Beneficial alternates
If proposed, explain cost or schedule improvements, clearly identify and separately price them. An RFP-compliant baseline must accompany every alternate.
08
Other submission documents
Italy permits / licences / registrations, or applications with process and timing. Lower-tier subcontractor list, prior client / Candidate experience and selection process ensuring requirements / law. Explain sponsor / brand obligations and marketing, signage or operational adjustments that preserve quality.
A01/04/08 / REQUIRED / SUPPORTING
Company, licences & references
PROPOSED LEAD Legal + Finance + Benchmark + Italy team
What must be included
Attach company-register extracts and evidence of the contracting entity / Italy presence or establishment plan. Provide five client references and five similar projects completed in the last ten years, with the required project / contact / cost / delivery / team / scope facts. Include consultant / major subconsultant contact details, backgrounds, qualifications and relevant CVs. Include Italy work licences / registrations / permits, or applications with process and timing. Disclose five-year claims / disputes / litigation and relevant Italian-law experience; financial-capacity documentation is encouraged.
Format & treatment
Evidence in the A response or clearly indexed attachments; financial documents are encouraged.
Suggested file
06_Corporate_Project_and_Licence_Evidence.pdf
Source requirement
Exhibit A §§01,04,05(iii),08
A03 / REQUIRED
COI & insurance schedule
PROPOSED LEAD Insurance / Risk + Legal
What must be included
Show current insurance evidence, proposed relevant policies and maximum cover limits. Compare project requirements for professional, general, auto and employer liability / other relevant cover with available cover and identify exceptions. Review the draft EUR limits, claims-made tail, additional-insured periods and mixed employer-liability currencies. Bid-stage sample evidence is different from the final Agreement-compliant certificates required before services.
Format & treatment
Sample current COI or equivalent + project coverage schedule; PDF recommended.
Suggested file
07_COI_and_Insurance_Schedule.pdf
Source requirement
Exhibit A §03; draft Agreement insurance clauses
B / REQUIRED
Proposed Scope of Services
PROPOSED LEAD Design + Operations + Culinary + Built
What must be included
Define the required Design Consultation and Approvals scope, outputs, interfaces with architects / kitchen consultant, authority support and responsibilities. Respond to Exhibit B and distinguish each offered concession, premium and catering operating alternative. Reconcile assumptions, exclusions, client responsibilities, technology, equipment, maintenance and scope with the execution plan and Exhibit F. Do not assume the client has awarded operating rights.
Format & treatment
An attachment responding to Exhibit B; PDF recommended.
Suggested file
08_Exhibit_B_Proposed_Scope.pdf
Source requirement
RFP Art. 5; Exhibit B; Exhibit F
C / REQUIRED
Duration-based programme
PROPOSED LEAD Design + Built + Operations + Bid Leadership
What must be included
Provide the proposed duration-based programme, tied to the supplied design / construction / opening assumptions. Show consultancy activities, approvals, deliverables, dependencies and responsibilities; reconcile it with scope, phase fees and staffing effort. Explain current-status assumptions because the source phases began before bid submission. The indicative July 2031 opening and overlapping design phases are not guaranteed dates.
Format & treatment
Duration-based schedule using Exhibit C assumptions; PDF recommended.
Suggested file
09_Exhibit_C_Proposed_Timeline.pdf
Source requirement
RFP Art. 5; Exhibit C
G / MISSING INPUT
Information Pack response
PROPOSED LEAD Bid Leadership + client procurement
What must be included
Obtain the missing Exhibit G from procurement and confirm its contents, any acknowledgement / completed response and the required attachment. Art. 5 expressly lists it, but the supplied set does not contain it. Do not invent its requirements or mark it complete. Record unresolved inputs and reconcile any new data across scope, demand, programme and pricing.
Format & treatment
Art. 5 requires an attachment addressing Exhibit G; return requirements must be clarified.
Suggested file
10_Exhibit_G_response_after_receipt.pdf
Source requirement
RFP Art. 5; Exhibit G absent from supplied files
D / REQUIRED
Current Commitments
PROPOSED LEAD Bid Leadership + Commercial + Benchmark
What must be included
Enter company name and date. For each major project / current commitment: ID, owner and location, client, description / type (concession, premium, catering), work performed / delivery method, contract value, start date, completion date and reference name / company / email / phone. Include anticipated awards, completion dates and company backlog value as required by A; add rows or a clear supplementary schedule when needed.
Format & treatment
Excel (.xlsx), using Exhibit D in the supplied combined D/E workbook.
Suggested file
11_Exhibits_D_and_E_completed.xlsx - D tab
Source requirement
RFP Art. 5; Exhibit A §04(ii); Exhibit D workbook
E / REQUIRED
Staffing, CVs & organisation
PROPOSED LEAD People + Design + Operations + Culinary
What must be included
Complete company / date, employee, role, years of relevant and similar-project experience, certifications / licences and zone responsibility. Use the separate consultancy and additional-operations blocks; add rows as needed. Supply CVs for Project Director / Principal, Overall Operations Manager, Lead Chef and other key people; disclose combined roles. Add full staffing, organisation chart, named prime / partner / subconsultant responsibilities, phase effort / commitment matrix and technology / sustainability expertise.
Format & treatment
Excel (.xlsx) Exhibit E + CVs, full staffing / organisation and phase-effort matrix.
Suggested file
11_Exhibits_D_and_E_completed.xlsx - E tab + 12_Team_CVs_and_Organisation.pdf
Source requirement
RFP Art. 5; Exhibit A §05(iii); Exhibit E workbook
F / BASE / REQUIRED
Consultancy financial proposal
PROPOSED LEAD Commercial + Design + People + Legal
What must be included
Price the complete Design Consultation and Approvals scope by phase and reconcile the sum to the total fee. State scope, duration, outputs, assumptions and applicable financial terms; tie the figures to B, C and E. Draft Annex 5 uses a fixed EUR professional fee excluding VAT / other taxes and hourly rates excluding VAT / INARCASSA / other taxes. State tax treatment and approved rates explicitly. Template engineering rates are not Levy prices. Additional services need prior written authorisation and agreed compensation.
Financial attachment responding to Exhibit F; clear phase table. PDF + supporting model recommended.
Suggested file
13_Exhibit_F_Consultancy_Fee.pdf
Source requirement
Exhibit A §02; Exhibit F; draft Agreement Annex 5
F / OPTIONS / IF OFFERED
Operating financial alternatives
PROPOSED LEAD Commercial + Operations + E15 + Built + Legal
What must be included
For each offered scope, state term (at least ten years in F), profit share, investment and any alternative terms; clarify the conflict with B's up-to-five-year term. Include staffing / management, approved POS and customer terminals, smallwares / tools, maintenance / repairs and discretionary investment. Respect client procurement of IPTV menu boards, signage and coordinated carts; bidder programs menus. Equipment bought by the bidder transfers to the client at term end; early-termination / buyout terms belong in the Agreement. Include premium FF&E and temporary-hospitality financial models where applicable.
Separately identify and price each offered operating scope; financial terms + supporting model recommended.
Suggested file
14_Exhibit_F_Operating_Alternatives.pdf
Source requirement
Exhibit F; Exhibit A §02; RFP p. 7; Exhibit B
A07 / IF PROPOSED
Beneficial cost / schedule alternates
PROPOSED LEAD Commercial + Design + Operations + Legal
What must be included
Describe the proposed improvement, exact scope / schedule change, separately priced value and the resulting total / commercial effect against the compliant baseline. State assumptions, dependencies and proposed contract changes. These value-improvement alternates are distinct from the additional operating alternatives. The client is not obliged to consider or accept them.
Separately identified narrative and price comparison; PDF recommended.
Suggested file
15_Beneficial_Alternates.pdf
Source requirement
RFP Art. 2; Exhibit A §§02,07
The tree groups RFP requirements into a proposed file pack. File names and PDF grouping below are recommendations. D and E must be Excel; Agreement edits must use tracked changes. No page limit, naming convention, file-size limit or fixed pricing spreadsheet is specified in the supplied pack.
FINANCIAL PROPOSAL / EXHIBIT F
ONE COMPLETE FEE. SEPARATE OPERATING CHOICES.
Make the required consultancy appointment assessable on its own. Each offered operating option needs clear financial terms and responsibilities.
BScope & outputs
→
CDuration & phases
→
ENamed people & effort
→
FPhase fees & total
Required
Consultancy baseline
Use agreed phases, not invented stage gates. Show phase / duration, scope and output, fixed fee in EUR excluding VAT, total fee and explicit tax / expense / assumption treatment. Reconcile B scope, C schedule, E effort and F figures.
If offered
Operating choices
Separate GA concessions, premium F&B and catering. Show offered term, profit-share mechanism, bidder investment, equipment / maintenance responsibility and assumptions for each scope. A single bundled number hides selectable options.
Recommended
Model for comparability
Define the profit-share base and cost / tax treatment. Show demand / attendance, spend / sales, COGS, labour, expenses, investment, replacement, cash flow and sensitivity cases. Document gross-sales definitions, rebate pass-through, utilities, sponsor / alcohol limits and asset transfer.
If proposed
Beneficial alternates
Price the delta and revised total against a compliant baseline, with exact changed scope / duration and dependencies. Do not make the alternate the only offer.
RECOMMENDED FEE TABLE / NOT A CLIENT TEMPLATE
Show the price of each agreed phase.
Phase / duration
Scope & deliverable
Fee EUR excl. VAT
Assumptions / tax treatment
Each agreed B / C phase
Named output and responsibility
Your approved phase fee
Explicit inclusions, exclusions and applicable taxes
Total consultancy
Complete required scope
Sum of phase fees
Reconciled with staffing and programme
No actual Levy fee, profit share, investment amount or approved rate has been supplied. This guide explains the submission structure; it does not invent commercial figures. Draft Annex 5 contains engineering hourly rates that must not be copied as approved Levy pricing.
DELIVERY / RFP ARTS. 5, 6 & 8
RECEIVED. COMPLETE. SIGNED.
Deadline
23 October 2026, per bid lead. Confirm the extended cut-off time and written addendum; do not assume the original 18:00 CET carries over.
Send to
daniele.carano@caaicon.com; copy kim.groves@caaicon.com. Electronic proposal by email; no submission portal is specified.
Receipt
The complete pack must be received, not merely sent. Obtain receipt confirmation and preserve the final attachments and delivery record.
Complete
Proposal Form signed; A Sections 01-08 covered; B-H and Service Agreement addressed; D/E provided in Excel; G obtained / clarified.
Consistent
Scope, schedule, people, phase fees and operating assumptions reconcile. Mandatory, optional and conditional items are clearly identified.
Verify recipient / copy, addenda and cut-off time; confirm complete receipt. Post-award execution and tasting are later stages, not substitutes for bid attachments.