Design Consultation & Approvals
Support the appointed design team so the stadium’s F&B spaces work for guests, staff and the business.
Stadio San Siro S.p.A. is inviting Levy Italia to propose how it will help plan and design food and beverage for the new AC Milan and Inter stadium, with separate proposals for operating concessions, premium hospitality and catering once the stadium opens.
Support the appointed design team so the stadium’s F&B spaces work for guests, staff and the business.
Submit separate financial proposals for operating these services. The Client decides which scopes to award. A design appointment does not guarantee operating rights.
This is a bid for the expertise that shapes how food and beverage will work in Milan’s new stadium: what guests can buy, where and how they are served, and what spaces, kitchens, systems and people are needed to deliver it. The mandatory commercial response is a design-consultancy proposal. Future F&B operations are separate options for the Client to evaluate.
CAA ICON manages the procurement/project interface. The venue is the new stadium for AC Milan and Inter in San Siro, Milan.
Capacity stated in the draft Agreement. This is a design-scale indicator; attendance, premium inventory and annual event volumes remain unconfirmed.
Combine Italian delivery capability with Levy’s international stadium experience. Confirm the contracting entity, named team and committed resources before release.
A stand-alone professional-services appointment, from agreement through the design process to the indicative stadium opening.
Levy must explain the work, the team, the deliverables and the price even if no operating services are subsequently awarded.
Three distinct service scopes that the Client may select in whole or in part. An operating appointment is conditional on the final award and agreement.
General-admission food and beverage: retail outlets, service formats, associated staffing, equipment and operating delivery.
Hospitality for different premium tiers, with differentiated food, service standards and commercial propositions.
Players and staff catering, alongside third-party event catering and relevant facility operations within the agreed scope.
Separate the consultancy fee from operating economics, investment and assumptions. Clarify the five-year / minimum ten-year operating-term discrepancy before committing.
The scopes must work together technically. They remain separate commercial decisions.
Plan for both clubs, different audiences, GA and premium guests, and intense pre-match and half-time demand.
Concerts and entertainment are contemplated; third-party catering is part of the requested scope. Event configurations, volumes and rights need confirmation.
Players/staff catering is required. Year-round destination and premium-extension ideas require demand evidence, access rights and commercial validation.
The business case is not yet fully specified. The reviewed pack does not provide annual event counts, validated attendance scenarios, confirmed outlet/POS quantities, premium inventory or a F&B CAPEX envelope. Ask for these inputs and use labelled scenarios until they arrive.
Bid-lead deadline update. Obtain the written extension, exact time and time zone. Original RFP deadline: 9 October 2026, 18:00 CET. Reconfirm tasting, interview and award dates.
Definitive design, PFTE and executive-design stages overlap. Align Levy’s deliverables and resources with the current design status and the Client’s review process.
Coordinate the agreed F&B design contribution and readiness activities. Any awarded operating service begins at opening under its own agreed scope and terms.
Company capability, relevant international experience and five comparable client references; current commitments in Exhibit D; named key personnel, CVs and phase effort in Exhibit E.
Stadium approach, delivery programme, technology, players/staff catering, responsibility matrix and marketing. Connect the concept to realistic operating flows and Client targets.
Price consultancy and any operating alternatives separately in Exhibit F. Complete the required forms and supporting evidence, identify specific contractual amendments and submit a signed electronic proposal by email with receipt confirmed.
The immediate task is to agree the scope and resources behind a credible bid. The final F&B solution remains to be developed and validated.
These labels distinguish the brief from the solution we still need to develop.
Client: Stadio San Siro S.p.A. · Procurement/project management: CAA ICON · Venue: new multipurpose stadium in San Siro, Milan.
A comprehensive F&B design-support appointment from agreement to opening: venue experience, space planning, kitchens, concessions, premium areas, systems, operational flows, technology and local approval support.
General-admission food and beverage services, associated people, systems, equipment and operating controls.
Differentiated hospitality tiers, service standards and premium commercial propositions.
Players and staff, together with third-party events and the relevant facility operations.
A Milan and Lombardy food identity, respecting both clubs and capable of attracting guests beyond matchdays.
Fast, accessible service and distinctive premium experiences, supported by a credible operating and commercial model.
Relevant design experience, named people, a detailed execution plan, measurable assumptions and a priced scope.
The pack identifies a multipurpose venue and several service occasions. It does not provide a quantified annual event programme. “Year-round destination” is an ambition, not a commitment to 365 trading or event days.
| Event / service occasion | Status in the supplied documents | Planned frequency & quantity | Implication for the F&B response |
|---|---|---|---|
| AC Milan home matchesFootball / stadium bowl | Named home club. Matchday GA and premium F&B form part of the venue proposition. | Not supplied No annual number, competition split, fixture calendar or attendance guarantee. | Model matchday demand by stand, premium tier and service window. Request competition and attendance scenarios. |
| Inter home matchesFootball / stadium bowl | Named home club. The Client asks for a dual-club identity with one coherent F&B experience. | Not supplied No annual number, fixture calendar, attendance guarantee or club-specific trading profile. | Test club-specific audience/product needs and turnarounds between fixtures. Avoid double-counting shared-stadium derby events. |
| Concerts & entertainmentMultipurpose venue | Sports/entertainment venue described; concerts are expressly contemplated in operating conditions. | Not supplied No confirmed concerts per year, sellable event capacity, standing-floor configuration or visitor forecast. | Assess different arrival/dwell profiles, floor concessions, premium opening and changeovers. Event alcohol restrictions may apply. |
| Third-party eventsHired / promoted events | Exhibit A requires a catering plan for third-party events. Exhibit B anticipates third-party/promoter/renter uses. | Not supplied No bookings, annual count, guest numbers, room inventory or service schedule. | Develop scalable catering formats and logistics. Corporate meetings, banquets or exhibitions may be explored as ideas; no specific booking programme is confirmed. |
| Civic / not-for-profit eventsSpecial uses | Named as possible events; municipality/other authorised uses may fall outside standard operating scope. | Not supplied No annual frequency or minimum volume; commercial rights and support requirements need confirmation. | Identify coordination, access and cost assumptions. Do not assume exclusive catering or normal alcohol sales. |
| Players & staff cateringRecurring service, not a public event count | Explicitly required in the proposed execution plan. | Not supplied No daily covers, service days, meal windows, team/staff populations or exact facilities. | Request meal/service schedules and dietary requirements; develop a separate secure, controlled catering model with club specialists. |
| Year-round food destination / premium extensionCommercial ambition | RFP asks for year-round destination thinking. Exhibit A invites premium extension beyond the stadium. | Concept to develop No guaranteed operating days, footfall, external-area capacity or approved event programme. | Explore aperitivo, local-food activations, plaza/fan-zone formats and seasonal events. Validate rights, spaces, demand and economics before commitment. |
Annual commercial model: event days × attendance × purchase behaviour × basket value, segmented by event type. Model premium packages, staff catering and non-event trading separately to avoid double counting.
Peak capacity model: orders arriving within a service window versus validated production, payment, collection and replenishment capacity in each zone.
Use low/base/high assumptions until the Client supplies the inputs. A stadium-seat figure cannot establish either annual revenue or the number of service points required.
Tender dates, construction milestones and operating targets are different commitments. This visual keeps their status and timing visible.
Working bid deadline.
Written notice & time pending.
Originally week of 19 Oct tasting;
6 Nov agreement finalisation.
Definitive / PFTE / executive design.
Align F&B input to the live design.
Construction window in Exhibit C.
Opening is indicative, not guaranteed.
single-use plastics
F&B satisfaction
matches: ultra-premium sold out
regional ingredients
food waste · baseline to agree
Client targets are objectives, not achieved results. Year/season definitions and measurement rules must be agreed.
The Client is asking for a coordinated, resourced and priced proposal — supported by evidence and the required forms.
| Response | Content that must be clear | Working coordination |
|---|---|---|
| 01 Company | Cover letter; legal entity/register; organisation, capacity and Italy presence; proposed partners; five-year claims/disputes disclosure. | Italy leads; Levy supports. |
| 02 Pricing | Complete phase pricing and financial terms; consultancy separate from operating alternatives; cost/schedule alternates separately identified. | Levy + Italy Sales / Finance. |
| 03 Insurance | Current standard certificate/equivalent; existing and proposed relevant cover and maximum limits. | Italy Legal / Insurance. |
| 04 Experience | Comparable work in the last 10 years, fields a–g; five client references; current projects/backlog in D; Italian-law experience. | Levy international; Italy local/legal. |
| 05 F&B approach | Design and execution approach; technology; players/staff and third-party catering; responsibility matrix; E/CVs/effort; marketing; menus/locations; premium extension. | Levy integrates; Italy leads menus/locations and local inputs. |
| 06 Inclusion | Workforce inclusion approach and relevant Italian-market experience. | Italy / People. |
| 07 Alternates | Any cost/schedule improvement proposed in addition to a compliant base bid. | Italy + relevant specialists. |
| 08 Other documents | Italy licences/permits or application route; lower-tier subcontractors/selection; sponsor/branding integration. | Italy with Legal / Marketing. |
D: ongoing projects, dates and backlog. E: key personnel and CVs, with phase effort and availability. F: consultancy fee and separate operating terms. Include B/C-aligned scope and programme, NDA/eligibility evidence and required tracked Agreement edits.
Tottenham, Johan Cruijff ArenA, Aston Villa, The O2 and Wimbledon are the agreed international candidates. Obtain all a–g fields. Annual turnover is not final project cost or total contract value. Active-construction experience needs specific evidence.
If shortlisted, interview and in-person tasting/service demonstration. Originally scheduled for the week of 19 Oct; reconfirm after extension. Selected candidates are asked to return executed documents within two calendar days of receipt. No appointment exists until a definitive agreement is signed.
LOI/NDA issued 3 Sep · NDA due 7 Sep · RFP received 11 Sep · questions due 18 Sep, 18:00 CET · Q&A addendum planned 25 Sep or later · original proposal deadline 9 Oct, 18:00 CET · interview/tasting week of 19 Oct · agreement finalisation 6 Nov 2026.
The existing bid-lead update moves the working submission date to 23 Oct. Revised downstream dates are unconfirmed. The supplied pack also states 120-day validity and conflicting fixed dates of 30 Jan / 6 Feb 2027. Obtain a single written instruction; do not infer the effect of the extension.
Exhibit C is indicative. End dates include one month for Client approval. Our consultancy plan must be reconciled with actual design progress and current access/handover dates.
Review the design, information gaps, demand scenarios and responsibilities. Agree the initial assumptions and decision register.
Output: agreed design and operating brief.Compare zoned offers, service formats, flows, equipment and technology with E15 demand and Italy feasibility checks.
Output: preferred concept and option appraisal.Develop layouts/specifications and technical interfaces with appointed designers; support approval reviews and control changes.
Output: coordinated design review records.Support equipment/technology reviews, commissioning, handover and test criteria. Plan mobilisation for any awarded operations.
Output: validated readiness and operating plan.These are proposed work stages, not additional Client dates. Define exact deliverables, review obligations, resources and fees against the agreed programme.
All figures below are Client objectives. The proposed owners and delivery implications are internal recommendations. No missing measurement definition has been invented.
Size service and collection capacity by event window. Define sampling, peak periods and the start/end of a queue.
Design premium service and staffing around the guest journey; agree which services are measured.
Agree survey method, respondent base, event mix and reporting cadence.
Confirm package inventory, renewal definition and who controls sales and retention.
Confirm ultra-premium inventory, match denominator and responsibility for distribution.
Establish supplier coverage and agree whether the percentage is measured by spend, weight or another basis.
Baseline is not supplied. Define waste streams, measurement, prevention and donation routes.
Develop meaningful, clearly marketed and competitively priced options; agree the item-count methodology.
Allow for reusable cups, washing/returns, compliant packaging and water refill infrastructure.
Confirm F&B evidence and responsibilities with the venue certification team. This is not a Levy company certificate.
Cashless/contactless POS; mobile pre-order and pickup; a shared stadium app if applicable; premium in-seat delivery; loyalty and real-time menu/wait information. Digital menu boards at all outlets should support Italian, English and Spanish, stock availability, nutrition and allergens. Assess smart-fridge/automated retail pilots and AI-supported pricing/menus within Client approval rules.
Event flash within two hours of the event ending; preliminary sales by noon the following day; finalised reports within 72 hours. Audited/reconciled monthly reports within 15 days of month-end. Annual budget 90 days before the Agreement Year; annual audited statement within 90 days of fiscal year-end. Confirm the final financial/contractual application.
Consultancy SLAs, payment, insurance & full terms →planned seats from the draft Agreement recital.
Outlet and POS counts · kitchen/storage areas · premium-seat, suite and lounge inventory · event calendar and attendance · staffing volumes · F&B CAPEX allowance · guaranteed revenues or volumes.
The per-capita spend ambition has no numeric figure in the RFP. Model assumptions transparently; do not fill the gap with an invented target.
The existing working allocation remains: Italy leads corporate/local evidence and menus; Levy leads the international design approach and references, working with Italy on pricing and delivery. The workstreams below make that allocation actionable.
Turn the fan promise into a venue that can deliver it.
Give the design a demand model it can stand behind.
Levy proposes and substantiates the solution. The Client retains approval of relevant products, locations, prices, brands, portion/quality standards, suppliers/subcontractors, staffing matters, uniforms, advertising and technology. Qualified designers and authorities retain their own responsibilities.
Menu boards & signage: Client oversees relevant procurement/design/installation under Exhibit F. Operator programming and content remain approval-controlled.
Equipment & commercials: account for maintenance/repair, Client-approved enhancements, end-of-term equipment transfer and full pass-through of supplier discounts/rebates.
Prioritise missing inputs that affect compliance, scope, resourcing, price or the credibility of the proposed guest experience.
23 Oct 2026 is the bid-lead update on the existing briefing; the supplied RFP states 9 Oct, 18:00 CET. Written extension, submission time/time zone, revised interviews/tasting and award dates are missing.
Action: Obtain written confirmation and use it to rebase the workback. Do not carry the old 18:00 time onto the new date by assumption.
Exhibit G and the latest approved stadium information are missing. There is no confirmed outlet/POS count, premium inventory, area schedule, event programme or F&B CAPEX allowance.
Action: Request the design pack and operational/commercial inputs. Use explicitly labelled scenarios until supplied.
The Client may select some or all scopes. Exhibit B says up to five years; Exhibit F requests operating proposals of no less than ten years.
Action: Confirm applicability and propose a clearly qualified commercial basis; keep required consultancy separate.
The pack contains a 120-day validity statement and conflicting fixed dates of 30 Jan / 6 Feb 2027; the extension may affect the intended period.
Action: Request a single confirmed validity instruction; do not silently recompute or choose one date.
Named Milano appointments, phase effort and design consultants are not complete. Roberto Carvelli is pending appointment in the working note.
Action: Confirm roles, availability, CVs and consultant estimates; distinguish Client-direct appointments.
Current entity-specific certificates, insurance evidence and complete a–g reference data remain to validate. The supplied All. B appears to concern a separate municipal sponsorship procedure.
Action: Obtain current evidence, missing contacts/values/format splits and clarify the eligibility form before signing.
Waste baseline, local-sourcing denominator, queue methodology, premium inventory and marketing/sponsor rights require agreement.
Action: Provide proposed measurement rules and identify Client decisions; do not claim guaranteed results or unrestricted rights.
Start with BUILT, E15, Italy Design, Culinary, Operations and Finance. Use one assumptions register and the same demand scenarios.