PROPOSED INTERNAL WORKING BRIEF / Experience & design

BUILT
Turn the fan promise into a venue that can deliver it.

Lead the integrated F&B experience and concept workstream: connect physical space, service formats, technology and the commercial brief. Coordinate with Italy’s design team and the Client-appointed designers. BUILT’s proposed role extends beyond equipment and CAPEX.

View the Global Big Picture →

Working direction for the Milano bid. Named owners, resources and the final solution still require confirmation.

THE QUESTION TO ANSWER

What should we build, where, and why will it work?

Lead the integrated F&B experience and concept workstream: connect physical space, service formats, technology and the commercial brief. Coordinate with Italy’s design team and the Client-appointed designers. BUILT’s proposed role extends beyond equipment and CAPEX.

01 / Experience & spatial concept

Develop a zoned F&B concept for GA, premium, players/staff and event catering. Map the journey from arrival and aperitivo to pre-match, half-time and departure. Compare traditional concessions, grab-and-go, self-service and premium service where appropriate.

Required internal output

Annotated zoning diagram, outlet concept cards and service-format options. For every option: guest need, location logic, production method, replenishment route, accessibility and assumptions.

02 / Capacity & technical interfaces

Translate E15 demand and Operations throughput assumptions into indicative service-point, kitchen, storage, wash-up and waste requirements. Identify utilities, extraction, refrigeration, delivery, circulation and maintenance access interfaces with the qualified designers.

Required internal output

Capacity brief and equipment principles; interface register identifying who designs, supplies, installs, approves, operates and maintains each element. Quantities remain conditional on validated plans and modelling.

03 / Options & design gates

Compare a compliant core concept with separately identified enhancements. Test operational impact, capital cost range, flexibility, maintainability and sustainability. Show how the design develops from review to commissioning.

Required internal output

Option appraisal, phased consultancy deliverables and design review schedule. Recommend a preferred concept with reasons, unresolved dependencies and a Client decision at each gate.

IDEAS TO DEVELOP · NOT AN AGREED SOLUTION
  • A “Taste of Lombardy” concourse: regional food identities adapted to different stand and crowd profiles, sharing efficient production and replenishment infrastructure.
  • A scalable service kit: standard concession, assisted self-service and grab-and-go variants. Design for future change without committing every zone to one technology.
  • A premium-to-plaza journey: assess whether selected hospitality offers can extend into exterior areas and non-matchday events, subject to rights, access, safety and demand.

Bring to the bid

A concise concept deck + annotated spatial brief + option/interface register + phase-by-phase consultancy scope.

Decision this enables

Choose the preferred concept and the scope that Levy can price and resource independently of an operating award.

Ready when

Each concept has a customer need, capacity rationale, operational route, cost assumption and named approval interface. Any missing drawing, budget or calculation is visible.

Handoff & dependencies

E15 supplies demand ranges → BUILT proposes layouts and formats → Italy Operations and Culinary validate delivery → Finance tests affordability → Client/design team approve.

Named owner: to confirmFirst pass: G1 / challenge at G2Final: G3, then G4 release

Response mapping: Exhibit A §05(i), (ii), (v), (vi); Exhibit F — Design Consultation and Approvals.

EXPECTED SUBMISSION FROM THIS TEAM

The minimum bid-ready package.

Use this as the proposed structure for the first working submission. The substance matters more than the number of slides or pages. Confirm the owner, effort and scope before committing the final offer.

  • A guest-journey board covering arrival, pre-match, half-time, post-match and relevant non-matchday use, with distinct needs for GA and premium guests.
  • An annotated zoning concept identifying food offer, service format, production/finishing, collection, replenishment, waste and accessibility for each proposed type of area.
  • An option schedule comparing the compliant core proposition and enhancements: benefit, spatial requirement, technology dependency, indicative cost basis and approval needed.
  • A technical interface register and phased design-consultancy deliverables schedule for Italy Design, appointed consultants and Finance.
ILLUSTRATIVE MILANO APPLICATION

What a useful first response looks like.

For a busy concourse, develop a traditional concession, an assisted self-service option and a grab-and-go option against the same demand scenario. Show how guests choose, pay, collect and leave; how stock reaches the outlet; and how waste and returns are removed. Use this comparison to recommend the format, rather than selecting technology first. Without approved drawings, provide a labelled typology and a list of spatial requirements, not a claimed final layout.

RESOLVE BEFORE DEVELOPING THE DETAIL

Questions the team must close.

  • Which design decisions are still open, and where can F&B input influence the current stadium design?
  • What peak demand and menu complexity must each zone accommodate?
  • Which drawings, budget assumptions, building-services limits and Client approvals are needed to progress the preferred option?
READY FOR THE INTEGRATED REVIEW

Bring a reviewable proposal.
Make assumptions visible.

Include the proposed recommendation, supporting evidence, unresolved inputs and the decision required from the wider team.