Can food, people and stock move safely when the stadium is full?
Validate the concept as a live venue operation and prepare a conditional mobilisation approach for any operating scope selected by the Client.
Map deliveries, receiving, storage, preparation, dispatch, replenishment, returns and waste. Compare service formats and calculate capacity from defensible service times.
Service-flow diagrams and capacity assumptions; storage/stock and equipment-management plan.
Model peak deployment, cross-training, break cover and event changeovers. Define responses to POS/network failure, refrigeration faults, stock shortages and restricted access.
Event operating model, labour assumptions, fallback procedures and key training requirements.
Define phased mobilisation, access/handover dependencies, recruitment, supplier onboarding, equipment testing, rehearsals, test events and readiness acceptance.
Mobilisation workback and readiness checklist, to be rebased once opening and access dates are confirmed.
- Walk a product and a team member through the design to expose crossing routes and hidden replenishment constraints.
- Use staged test events to measure queue, dispatch and replenishment performance before accepting the operating configuration.
Bring to the bid
Execution plan + logistics/storage flows + peak-service model + mobilisation and resilience plan.
Decision this enables
Validate which formats and capacity assumptions can credibly support GA <5-minute and premium <3-minute average queues.
Ready when
The model covers the whole supply-to-service chain and named venue interfaces; active construction/site access assumptions are explicit.
E15 demand → Operations capacity → BUILT layout changes → People staffing → Technology fallback tests.
Response mapping: Exhibit A §05(i)–(iii); Exhibit B operating scope and maintenance.
Bring a reviewable proposal.
Make assumptions visible.
Include the proposed recommendation, supporting evidence, unresolved inputs and the decision required from the wider team.