PROPOSED INTERNAL WORKING BRIEF / Experience & design

Italy Design & Technical
Make the concept fit the actual building and approval process.

Coordinate the Italian technical response and interfaces with the Client’s architects, kitchen consultant, engineers and qualified local professionals. Confirm who is responsible for each formal design and submission.

View the Global Big Picture →

Working direction for the Milano bid. Named owners, resources and the final solution still require confirmation.

THE QUESTION TO ANSWER

How does the F&B concept become coordinated, approvable design?

Coordinate the Italian technical response and interfaces with the Client’s architects, kitchen consultant, engineers and qualified local professionals. Confirm who is responsible for each formal design and submission.

01 / Design gap review

Review received plans against the F&B brief. Record gaps in space, flows, accessibility, equipment and building services, including interfaces with security and event operations.

Required internal output

Annotated design review and prioritised gap register.

02 / Consultant scope

Identify required specialist support and whether appointed by Levy or directly by the Client. Obtain scope, qualifications, availability and best fee estimates for Client-direct consultants.

Required internal output

Consultant schedule, contact details, relevant experience and estimated fees; explicit appointment assumptions.

03 / Coordination & approval

Map design submissions, review cycles, local approval support and change control to the live programme. Identify accountable qualified designers and authority interfaces.

Required internal output

Design deliverables register and responsibility matrix; authority/approval pathway for confirmation.

IDEAS TO DEVELOP · NOT AN AGREED SOLUTION
  • Use one interface register for kitchen equipment, MEP, structure, fire strategy, accessibility, ICT and F&B operations.
  • Make operational acceptance criteria part of each design gate, including replenishment and maintainability.

Bring to the bid

Coordinated technical scope + consultant/fee schedule + design responsibility and approval register.

Decision this enables

Confirm consultant appointments, design liability boundaries and deliverables included in the consultancy fee.

Ready when

No statutory designer or contractor responsibility is attributed to Levy without an agreed appointment; Client-direct consultant estimates are included.

Handoff & dependencies

BUILT supplies the concept; Italy technical professionals coordinate formal design; Operations validates use; Client approves scope and appointments.

Named owner: to confirmFirst pass: G1 / challenge at G2Final: G3, then G4 release

Response mapping: Exhibit A §05(ii)–(iii); Exhibit F design scope; Exhibit C programme.

EXPECTED SUBMISSION FROM THIS TEAM

The minimum bid-ready package.

Use this as the proposed structure for the first working submission. The substance matters more than the number of slides or pages. Confirm the owner, effort and scope before committing the final offer.

  • A drawing and information register recording revision, design stage, review status and outstanding F&B information.
  • A technical gap review linking each issue to the affected space, service, design discipline and required decision.
  • A consultant/appointment schedule covering Levy-appointed versus Client-direct roles, deliverables, availability, qualifications and best fee estimates.
  • A responsibility and design-review schedule linked to Exhibit C, including local approval support and agreed change control.
ILLUSTRATIVE MILANO APPLICATION

What a useful first response looks like.

Take one proposed kitchen-to-concourse route and coordinate the whole chain with the appointed designers: receiving, storage, production, dispatch, vertical/horizontal distribution, outlet finishing and waste returns. Record where the concept depends on lifts, access rights, utilities or an unfinished design decision. The bid should show how these interfaces will be managed, even where final dimensions are not yet available.

RESOLVE BEFORE DEVELOPING THE DETAIL

Questions the team must close.

  • Which drawings and area schedules are approved, and which remain in development?
  • Who holds each design, engineering, permitting and sign-off appointment?
  • What review turnaround and design-resource commitment must be included in the consultancy fee?
READY FOR THE INTEGRATED REVIEW

Bring a reviewable proposal.
Make assumptions visible.

Include the proposed recommendation, supporting evidence, unresolved inputs and the decision required from the wider team.