Build the environmental commitments into the operating design.

Translate the RFP’s sustainability targets into feasible actions, measurements and responsibilities, with Italy’s quality, food-safety and procurement teams.

View the Global Big Picture →

Working direction for the Milano bid. Named owners, resources and the final solution still require confirmation.

THE QUESTION TO ANSWER

What must be designed now to make Day 1 and Year 3 targets credible?

Translate the RFP’s sustainability targets into feasible actions, measurements and responsibilities, with Italy’s quality, food-safety and procurement teams.

01 / Opening requirements

Define reusable-cup circulation, wash capacity, return points, water refill and packaging specification toward zero single-use plastics from Day 1.

Required internal output

Opening circularity plan and infrastructure requirements.

02 / Improvement pathways

Develop waste prevention, donation, separation and on-site composting feasibility; link to sourcing and plant-based objectives. Agree denominators and baselines.

Required internal output

Target/action/owner/measure register and roadmap through three seasons/Year 3.

03 / Assurance & venue certification

Map food safety, allergens, supplier approval and operational controls; identify evidence required to contribute to mandatory stadium LEED Gold.

Required internal output

Assurance and evidence plan aligned with qualified Italy teams and the venue’s certification consultant.

IDEAS TO DEVELOP · NOT AN AGREED SOLUTION
  • Design cup returns and waste sorting as part of crowd flow, not an afterthought.
  • Measure waste by operational stream to distinguish overproduction, spoilage and plate waste before setting reduction actions.

Bring to the bid

Sustainability delivery matrix + circularity/infrastructure brief + baseline and assurance plan.

Decision this enables

Confirm feasibility, cost and measurement of each commitment, including composting and donation arrangements.

Ready when

LEED Gold is a stadium requirement, not a claim that Levy Italia holds that certification. No unverified corporate certificate or partner is presented as current.

Handoff & dependencies

Culinary/Procurement specify products; BUILT designs infrastructure; Operations runs controls; E15 measures; Client certification team confirms evidence.

Named owner: to confirmFirst pass: G1 / challenge at G2Final: G3, then G4 release

Response mapping: RFP sustainability objectives; Exhibit A §05(v); Exhibit B energy and operating obligations.

EXPECTED SUBMISSION FROM THIS TEAM

The minimum bid-ready package.

Use this as the proposed structure for the first working submission. The substance matters more than the number of slides or pages. Confirm the owner, effort and scope before committing the final offer.

  • A target-delivery matrix linking every relevant Client objective to action, infrastructure, owner, cost input, measure and timing.
  • An opening circularity plan for reusable cups, washing, returns, water refill, packaging specification and waste segregation.
  • A three-season/Year 3 improvement roadmap covering responsible sourcing, plant-based menus, prevention, surplus donation and composting feasibility.
  • An assurance/evidence plan for food safety, allergens, supplier controls, waste baselines and the contribution to stadium LEED Gold.
ILLUSTRATIVE MILANO APPLICATION

What a useful first response looks like.

Trace a reusable cup from issue to return, wash, storage and reuse. Quantify the assumptions that will eventually determine stock, wash capacity, return locations and labour, using the agreed demand model rather than invented volumes. Apply the same end-to-end approach to food waste: measure where it arises, prevent it first, then assess safe redistribution and remaining waste streams.

RESOLVE BEFORE DEVELOPING THE DETAIL

Questions the team must close.

  • What waste, water, energy and washing infrastructure is included in the stadium design?
  • How will local ingredients, plant-based items and food-waste reduction be measured?
  • Which donation/composting arrangements and venue-certification evidence are feasible and require Client approval?
READY FOR THE INTEGRATED REVIEW

Bring a reviewable proposal.
Make assumptions visible.

Include the proposed recommendation, supporting evidence, unresolved inputs and the decision required from the wider team.